If want to create a schedule for an annual or covering several months but do not want to have to create lots of flights there is a solution. This solution only works though when you do not need to send an XML to an agency. This also assumes that it is the same schedule just over several non consecutive months
Create a one flight for what a one week run would be. Then open the setup tab next to flighing tab in the bottom left of Radius Scheduler:
That will open a popup window
Where it displays 1 for the number of weeks, change it to the number of weeks for the whole run. Example if it runs once a month for a year then change the number of weeks to 12. Do not enter any dates. When you go to create the report it will give you a one page report with the totals for the whole run.