How to create a schedule when the weeks change in a flight or you want to consolidate the number of flights.

How to create a schedule when the weeks change in a flight or you want to consolidate the number of flights.

What to do if you, have a multi flight you want to condense or a flight where the schedule changes week to week inside that flight?  Here are some workarounds.  Keep in mind these will not work when creating an XML for an Agency as they require dates.  For direct clients you either type in the dates in the "comment" section of Reporting or in the email you send the report in.  Look over both options below to pick the best one for your situation.  ( also at the botton of this page are links with short video on how to do some of the things mentioned below.

1) If you are creating a schedule where the weeks in each month are consecutive or even non consecutive but the schedule is the same for each week throughout the campaign.
          Just create a  one week flight representing the recurring week.  You created a schedule representing what each week of the campaing looks like. 
          Now in setup, set the number of weeks to the total number of the weeks the campaign will run.  Example the campaign runs 4 months, 2 weeks a month.  Total numbef of weeks is 8.  Set the
          number of weeks for the flight to 8 and do not add dates.   Now you have a one flight schedule covering all the weeks and with the totals for the whole run. ( see below about removing the "weeks 1" from reporting).

In this example I created a one flight schedule.  The schedule represents one week and then set the number of weeks on that one flight to 8 for the whole campaign.  One flight for the whole campaign


Here is a video showing you how to do option 1


2) If you are creating a schedule where the schedule changes from week to week in the month.

Enter the same daypart more than once to represent the each week the schedule will run in a month.  That way you can treat each daypart line as its own week but still get totals for the whole month.  You can even group sets of dayparts and use description to say what week it is.  You can also label the flights to the names of the months ( see example below)  REMEMBER IN SETUP YOU ARE LEAVING THE FLIGHT AS JUST ONE WEEK AS THE SCHEDULE REPRESENTS ALL WEEKS SCHEDULED IN THAT MONTH.    Now you can play with spots and rates to reach the monthly spend goal.

Put each day part you are using in the month in 4 times to represent the four weeks ( or 2 weeks if say two of the four weeks that daypart is not going to be included) and adjust each line to get your total month spend goal.   if some dayparts will not change each week you could just put them in once if you want.  EXAMPLE based on the morning daypart will change each week over a 4 week run.

In the example below I renamed the flights to the names of the Months that the campaign will actualy air (do not include months that are skipped).  I then added the dayparts for each week in the month and used description to label which daypart is part of which week.   Since the first flight ( March)  has three weeks in the campaign I created three sets of dayparts.  The third week there is no morning show so I do not have the morning show listed in week three (Do not leave dayparts with no spots. If a line is not being used delete it)  The total at the top says 1 week but it actually now represents the total for the whole month.   (See below about setting up the report)


Setting up the Report.
When in reporting, cliick on the GEAR icon and then on Tables.  Uncheck the box next to  "1 week Total" and then click Apply and OK. This will remove most of the statements on the report about each flight be 1 week.  Remember this is sticky so when you create a new report where you want one week totals you need to go to the GEAR ICON, TABLES TAB and Recheck the box.


Now you Multi Flight Schedule will look something like this:



There are one week totals, each flight is the name of the month, each flight of dayparts are labled and the total for each month is at the bottom of each flight.  The total for the whole campaign is at the bottom of the report:



Here is a video showing how to do option 2




On reporting it will show the first flight as 1 week.    You can use an PDF editor to erase it from the saved report if you want.

Helpful Links

How to use Flighting  Click Here
How to Create a Scheudule  Click Here
How to Add Daypart  Click Here
How to name Flighting Tabs  Click Here
How to Delele a daypart or insert a daypart line  Click Here



    • Related Articles

    • Toggle weeks on and off inside a single flight

      There is not a way in Radius to toggle weeks on and off within a single flight. However there is a possible workaround if you do not need to send an XML. Click on link below. NOTE: If sending an XML to an Agency their software requires dates be ...
    • How to create an annual schedule with multiple weeks without creating many flights

      If want to create a schedule for an annual or covering several months but do not want to have to create lots of flights there is a solution. This solution only works though when you do not need to send an XML to an agency. This also assumes that it ...
    • How to copy schedules to different flights

      Do you want to copy one flight schedule to another flight? It is easy to do. First click on the flight you want to copy. In this example we are copying flight one to flight two. So click on flight one to highlight it. Then Right Click the flight. and ...
    • Number of weeks not showing in Totals in Scheduler

      If you are trying to create multi week schedule and all that shows up in the totals is a row showing 52 weeks and not the number of weeks for you schedule. Here is a quick video showing you how to fix that.
    • Change what month or Demographic that a schedule is based on

      If you have an existing schedule that you want change what month (book) it based on, it is easy to change. Maybe you have a schedule you want to change the demographic it is based on. You do not have to re-create the schedule. You can simply change ...